Equinor Hires Aker Solutions to Help Electrify Troll B and C Platforms

Share:

Norway's Aker Solutions has secured a letter of intent from Equinor to carry out the topside work on the Troll B and C platforms offshore Norway to prepare them for power from shore, in order to reduce the CO2 emissions.

Aker Solutions said the contract was very large, which means its is valued somewhere between NOK 2.0 billion (237,28 million) and NOK 3.0 billion (USD 355,8 million).

The modifications will include the installation of equipment for receiving electrical power from shore via cable. This will replace power generation from gas turbines at the platforms, and thus reduce climate footprint..

Aker Solutions’ work will include engineering, procurement, construction and prefabrication of systems, and installation at the platforms offshore. The engineering and construction will be performed at Aker Solutions’ offices in Bergen, and at its yard in Egersund respectively. The award follows the completion of the front-end engineering and design (FEED) work that Aker Solutions was awarded in January 2020.

The company said Tuesday that the work would start immediately. The project is scheduled for completion at the end of 2025. 

The scope will include approximately 1,000 man-years for own employees, of which about 500 for engineering, 200 for construction and 300 for the work offshore. Including ripple effects, Aker Solutions siad, the scope is expected to involve a total of 4,000 people, including employees working with suppliers, services providers etc.

“Reduction of climate footprint is high on the agenda for our customers in the oil and gas industry. Electrification of production platforms is one of the ways to reduce emissions from such operations. Aker Solutions has extensive experience from delivering such low-carbon solutions, and we aim to be a leading contractor in this market. We are excited to collaborate with Equinor on the Troll electrification,” said Kjetel Digre, chief executive officer of Aker Solutions.

The Troll field lies about 65 kilometers west of Bergen on Norway’s west coast. The electrical power cable will be connected to shore at Kollsnes outside Bergen. The contract award is subject to a final investment decision and a regulatory approval.

No comments

More Popular Posts

About Crude Oil Brokers Ltd

Crude Oil Brokers Ltd is a dedicated global broker and facilitator of crude oil buying and selling. We work directly with crude oil buyers and crude oil sellers worldwide. We are a United Kingdom and Nigerian based firm, privately owned and devoted to the brokering of crude oil and other petroleum products buying and selling.

We have buyers and sellers of;

1. Nigerian Bonny Light Crude Oil, BLCO

2. D2 Diesel Fuel, JP54 Jet Fuel, Mazut etc.

3. Saudi Light Crude Oil, SLCO

4. Iraqi Light Crude Oil

If you are a buyer or seller of crude oil or other petroleum products or have mandate to buy or sell any of the above oil products, do contact us because we could be of help.

To contact Crude Oil Brokers, click here ». To learn more about Crude Oil Brokers Ltd, click here


Crude Oil Brokers